Webinars
GTS has produced many technical webinars on topics including MAOP Reconfirmation, Material Verification, Hydrostatic Testing in-situ Pipelines, and much more. Feel free to request to view any of our webinars below.

Transmission Rule Part 2
In this series of two webinars, we cover the most impactful parts of the Transmission Rule Part 2 that was published on August 24, 2022.

Deep Dive into GTS’ Regulator Station Review Program™
GTS’ Regulator Station Review Program (RSRP) has been developed to enhance an Operator’s understanding of their existing Stations. Join us as we cover all elements of the program.

MAOP Reconfirmation & Material Verification Webinar
The long awaited regulation changes are here! Join us as we review the impacts to natural gas asset Operators and efficient solutions to comply with these changes.

GTS’ Regulator Station Review Program™
GTS has developed a comprehensive method to assist Operators with Regulator Station Review programs. Join us as we dive into the program and learn how to minimize risk of system over-pressurization.

Implementing a Digs PMO & Materials Verification Program
GTS shares its experience from managing thousands of Digs and reconfirming MAOP for tens of thousands of miles of natural gas pipeline for clients across the nation.

Hydrostatic Testing In-situ Pipelines (Part 1 of 2)
Essential elements to plan, engineer and design in-situ hydrostatic tests to most efficiently execute your test and effectively establish MAOP. Learn about Test Optimization, Test Boundaries and planning, Spike Test Considerations, and much more.

Hydrostatic Testing In-situ Pipelines (Part 2 of 2)
Hear first-hand the planning, engineering and execution lessons learned that will help Operators be most effective in executing hydrostatic tests on in-situ pipelines.

GTS Roadmap to NPRM Compliance – The 15-Year Plan (Part 1 of 5)
Roadmap webinar series 1 of 5 from GTS’ 15-Year Plan. Introduction to NPRM Compliance that will guide Operators through the necessary steps to establish a 15-Year Plan.

GTS Roadmap to NPRM Compliance – MAOP Validation (Part 2 of 5)
Roadmap webinar series 2 of 5 from GTS’ 15-Year Plan. Learn about pertinent selections of 49CFR, Part 192, design calculations and equation factors, pipeline & station feature lists, and much more.

GTS Roadmap to NPRM Compliance – Records Review (Part 3 of 5)
Roadmap webinar series 3 of 5 from GTS’ 15-Year Plan. Learn about records scanning & storage, records types, access to records from PFL or GIS, and much more.

GTS Roadmap to NPRM Compliance – Asset Knowledge Acquisition (Part 4 of 5)
Roadmap webinar series 4 of 5 from GTS’ 15-Year Plan. Learn about Digs production management, Asset Knowledge acquisition via non-destructive and destructive testing of material, acquired Asset Knowledge use, and more.

GTS Roadmap to NPRM Compliance – Issues Mitigation Prioritization (Part 5 of 5)
Roadmap webinar series 5 of 5 from GTS’ 15-Year Plan. Learn about short-term vs. longer term issues resolution, use of “newly” acquired asset information, management of change, and much more.